options for homes – construction track

The Options for Homes pile driver has moved to the back of the lot now, at the top of the hill and appears to be pushing some piles into the ground, probably to shore up the soil to create the basement foundations and parking areas for the new buildings. The newsworthy part of this whole operation is the old CanTire building still stands.   Most of the time in condo development  the existing building demo is completed before the pile are driven for the new building shoring. This project may be beginning to fast track now, hopefully.

Leave a Reply