The Village by High Park, putting in two sections of rebar and concrete of 1 meter thick Post date February 2, 2010 Post categories In Uncategorized this area with the placement of rebar is directly to the left when looking west to the image below which is another area to filled with rebar and concrete to support the pullback of the building on this side. This area is undoubtedly filled by concrete by now and the building 3 three stories higher, yet it does provide a great insight to volume of materials needed to build this building. Tags Development, Options for Homes, Railways, The Junction, The Village by High Park, Ward 13 (Parkdale-High Park), Ward 14 – (Parkdale-High Park) Post navigation ←Previous post:Does the Junction require more thought from all of us?→Next post:Toronto West Diamond grade separation enters onto changing industrial streets Leave a Reply Cancel replyComment * Name * Email * Website Save my name, email, and website in this browser for the next time I comment. Δ