While the intersections in the Junction which need them are ignored Runnymede Road & Annette St and Runny and St. Johns St Accessible Pedestrian Signals.
1) Runnymede Road and Annette Street (PX0847) – Etobicoke2) Runnymede Road and St. Johns Street (PX0848) – Etobicoke
Scope of work:
The Contractor will be responsible for providing all the necessary resources to carry out, but not limited to, the following activities related to this project:
The Contractor shall be responsible for the installation of all required underground duct, handwells, ground plates, pole bases, poles and controller base. The Contractor is also responsible for the installation of all above ground traffic signal plant, APS units and pavement markings.
The Contractor shall also be responsible for the installation of concrete sidewalks, pedestrian ramps and other civil improvements related to the installation of the Accessible Pedestrian Signals.
Access to Toronto Hydro chambers and/or other confined spaces may be required as part of this work at some locations. The contractor must produce valid proof of certification from Toronto Hydro to the City of Toronto prior to awarding of contract. Refer to SS.8.
This Contract, including all site restorations, clean up, and rectification of all known deficiencies, must be completed by May 30, 2019.
On a location basis, all site restorations, clean-up and the rectification of any and all deficiencies are to be completed 90 days after the activation.
During construction the contractor with obey these working times.
Construction dates will be posted on this blog.
Construction Staging
Runnymede Road and Annette Street (PX0847)
Southbound – the Contractor shall be allowed to occupy the curb lane from 10:00 a.m. to 3:00 p.m. only. No obstruction to traffic lanes during the a.m. rush hours will be permitted. Northbound – the Contractor shall be allowed to occupy the curb lane from 10:00 a.m. to 3:00 p.m. only. No obstruction to traffic lanes during the p.m. rush hour will be permitted. Eastbound – the Contractor shall be allowed to occupy the curb lane from 10:00 a.m. to 3:00 p.m. only. No obstruction to traffic lanes during the a.m. rush hours will be permitted. Westbound – the Contractor shall be allowed to occupy the curb lane from 10:00 a.m. to 3:00 p.m. only. No obstruction to traffic lanes during the p.m. rush hour will be permitted
Runnymede Road and St. Johns Street (PX0848)
Southbound – the Contractor shall be allowed to occupy the curb lane from 10:00 a.m. to 3:00 p.m. only. No obstruction to traffic lanes during the a.m. rush hours will be permitted. Northbound – the Contractor shall be allowed to occupy the curb lane from 10:00 a.m. to 3:00 p.m. only. No obstruction to traffic lanes during the p.m. rush hour will be permitted. Eastbound – the Contractor shall be allowed to occupy the curb lane from 10:00 a.m. to 3:00 p.m. only. No obstruction to traffic lanes during the a.m. rush hours will be permitted. Westbound – the Contractor shall be allowed to occupy the curb lane from 10:00 a.m. to 3:00 p.m. only. No obstruction to traffic lanes during the p.m. rush hour will be permitted