Gardiner Expressway rehab east work tonight July 15 2020

Moving two supports east towards Cherry St as the supports are prepared for removal of the existing deck and replacement with the new deck.

 

About two blocks east the the casting of the concrete deck to the already built up steel deck structure is done a steam heated  construction shed.