THE BARGE – Glovertown Spirit delivers the Cherry St. bridge, all about the barge.

The barge with the 1st Portland’s rehabilitation bridge sat on it. This bridge is one of two crossings go the Keating Channel.

MAIN PARTICULARS

Builder Name
DAMEN SHIPYARDS GORINCHEM
NETHERLANDS (HOLLAND)

Owners: McKeil WORK BOATS GP INC.


Length O.A.243’ 7″  74.25 m
Breadth O.A.77’   23.50 m
Moulded Depth14’ 9”   4.50 m
Summer Draft 
Gross Tonnage2,073 t
Net Tonnage621 t


General information 

Cargo Capacity4,800 mt
Year Built2012
Official Number837731
ClassificationTransport Canada
NotationBarge
FlagCanada
All particulars McKeil Marine, https://mckeil.com

The bridge is Cherry Street North transit bridge linking the mainland to Villiers Island.

Leave a Reply