Category: Gardiner Expressway rehab 2019

Gardiner Expressway rehab east work tonight July 15 2020

Moving two supports east towards Cherry St as the supports are prepared for removal of the existing deck and replacement with the new deck.   About two blocks…

Lower Don River gets as straight edges for Don Valley Parkway, for the Bloor St to Gardiner Expressway

    In this drawing the darker winding line is the natural flow of the Don River, and the the straight line with the angled hatching is the…

Train tracks removed

Just west of the Keating Railway bridge these railway tracks are being removed, as part of the Port Lands Flood Protection Project, week ending Feb 1 2020. this…

Locking up though the Gardiner Expressway at the sky, right now for a few day more.

The green steel structure to the right is the east bound lanes. The west bound lanes of the Gardiner Expressway at Parliament St have been removed, and work…

Gardiner Expressway rehab ramp at Don River under structure repair starts today

Gardiner Expressway rehabĀ  ramp at Don River under structure repair starts Aug 15 2019