
the information below was accessed Feb 1st 2020 at the city waterfront site here
PARKS
In addition to 29 hectares of naturalized area within the new river valley and Don Greenway, the conceptual design identifies 16 hectares of parkland. This parkland includes parkland along the new river, Promontory Parks North and South and Villiers Park, which will be designed to include a variety of spaces, some for activities and some for relaxation.
This project includes design for the entire park and construction of the southern portion of the park. In total, we’ll build 11 hectares of parkland. Take a look at the transformation in store for the Port Lands.
As part of this project, we’ll build the southern portion of the park and design the northern portion.
In addition to 29 hectares of naturalized area within the new river valley and Don Greenway, the conceptual design identifies 16 hectares of parkland. This parkland includes parkland along the new river, Promontory Parks North and South and Villiers Park, which will be designed to include a variety of spaces, some for activities and some for relaxation.
This project includes design for the entire park and construction of the southern portion of the park. In total, we’ll build 11 hectares of parkland. Take a look at the transformation in store for the Port Lands.
We’re building parkland on the north and south sides of the new river.