2019 High Park play area changes

Colourized city map showing High Park area and site location of major play and landscape changes.

Changes to take place.

Cast-in-place concrete playground and sandbox border  Concrete playground ramp  Rubber playground ramp  Rubber safety surfacing  Engineered wood fibre safety surfacing and wear mats  Sub-surface drainage system c/w drywell, overflow and stone spillway/ splash pad  Sandbox  Playground equipment  Site furnishings (includes benches, patio tables, and umbrellas)  Concrete seat walls (integral beige concrete)  Decorative Boulders  Upright log border  Horizontal log border  Wading pool concrete tank and apron repairs  Replace center turret with new concrete fill wall  New wading pool drains and associated site servicing  Wading pool chamber upgrades (includes mechanical works, and new lids)  ‘Unstructured Playground Area’ materials (includes placement of decorative and memorial boulders supplied and delivered by others; stumps, branches, birch logs; plastic tubing, elbows and eaves troughs; wooden planks, blocks, boxes and saw horses)  Sod restoration

Leave a Reply