Dundas Street West – 1965 – 1966 Resurfacing and Widening costs.

Dundas Street West –

Bloor Street West to Sorauren Avenue;

Resurfacing and Widening –

Concrete Base, Curbs and Gutter, Sidewalks, Storm

Sewers, Catch Basins, and Asphalt Paving including

the Street Car Track Allowance.

MacDonald Paving, Ltd.

D. A. Patterson Cost $236,428

Leave a Reply