Shroud extensions work on piledriver Sat.

shrow-installation-with-arrow-7-2009-020

Shroud extensions were added to a pile driver this past Saturday  as CN crews worked in the background to skew a track to the south, at the West Toronto Go Tranist Diamond project.

Leave a Reply