Go Transit begins landscaping Black Creek Drive enhanced bridge area

 

 

Go Transit begins landscaping Black Creek Drive enhanced bridge area

It appears the major construction — adding new overhead tracks above Black Creek Drive is over. Crews are now working with landscape fabric on the embankments of the railway supports.

It’s spring!

By junctioneer on .Canonical linkExported from Medium on October 21, 20Last updated: Post repaired Oct 21 2024 for data loss in 2014 uploads database

Leave a Reply