The east port lands are stated by the city to bethe last significant undeveloped space in the downtown – about a 30- minute walk from Cherry and Commissioners Streets to 20 Bay Street.
the Ellis Don company is the contractor for the work pictured costing 1.3 billon dollars.
end of post